150m3/d integrated equipment for sewage treatment
1)Design of water according to the 150 m3 / d, 7.5 m3 / h;(1 day =24hours)
2)Geological data is unknown, according to the conventional geological thinking, not including equipment
foundation construction related fees;
3) Raw water parameter:
PH – Around 7 COD – 580 MG/l BOD – 300 MG/l TSS – 325 MG/l TKN – 35 MG/l
4) treated water quality:
PH – Around 7 COD – 50 MG/l BOD – 5 MG/l TSS – less than 1 MG/l TKN – 5 MG/l