150m3/d integrated equipment for sewage treatment
  1)Design of water according to the 150 m3 / d, 7.5 m3 / h;(1 day =24hours)
  2)Geological data is unknown, according to the conventional geological thinking, not  including equipment
   foundation construction related fees;
 3) Raw water parameter: Â
     PH – Around 7  COD – 580 MG/l  BOD – 300 MG/l  TSS – 325 MG/l TKN – 35 MG/l
4) treated water quality:Â
    PH – Around 7 COD – 50 MG/l BOD – 5 MG/l TSS – less than 1 MG/l TKN – 5 MG/l